Winter is for interior work in Central Utah

November 1, 20264 min readAllen Contracting

Every year around the first week of November, the phone changes. The calls about foundations and trusses taper off, and the calls about basements, bathrooms, floors and doors pick up. That is not an accident. Winter in the Sevier Valley is hard on exterior work and easy on interior work, and if you plan it right, the cold months are the best time to get the inside of your house done.

Here is how we think about winter jobs in Richfield and the rest of Central Utah, and a few things worth knowing before you schedule one.

Why framing slows down and trim does not

At 5,300 feet, a January morning in Richfield can start in the single digits. Lumber stiffens, nail guns and compressors fight the cold, and a crew standing a wall in a stiff wind at twenty degrees is slower and less careful than the same crew in May. Snow on a subfloor has to be shoveled before anything happens. Foundations poured in the cold need to be protected while they cure. None of that stops a build, but it slows one, and it is why we push to have a house dried in before Thanksgiving.

Inside a heated house, none of that applies. A basement, a bathroom, a floor or a set of interior doors goes in at the same pace in January as in June, and often faster, because the whole crew is on it instead of split with a framing job racing the weather.

What we like to do in winter

Basement finishes are the big one. Most of the jobs we take between November and March are basements, because the work is entirely indoors, the homeowner gets a finished space by spring, and the framing, drywall backing, doors, trim and flooring are all things one crew can carry straight through. The one piece to plan ahead is an egress window. If your basement bedroom needs one cut in, the excavation and the concrete cutting go much easier before the ground freezes hard, so we try to get the window in during the fall and do the rest of the basement over the winter.

Bathroom remodels are the second. A tub to shower swap, new tile, a new vanity and a new door are all interior, and the work happens behind a closed door while the rest of the house stays warm.

Flooring, interior doors, baseboard and casing round it out. They make an older Richfield house feel new without touching an exterior wall.

The things winter changes

Winter does not make interior work harder, but it changes a few things worth knowing up front.

Wood moves. Our winter air is dry. Hardwood, engineered wood and even LVP need to sit in the house, at normal living temperature, before they go down. We ask for the house to be heated to the temperature you actually live at for several days before and after a floor install. If a floor goes into a cold house and the heat comes on later, it will shrink and show gaps. The same goes for trim. Baseboard installed in a house at fifty degrees will open up at the miters when you turn the furnace to seventy.

Dust and air. With the windows shut, dust from demolition and sanding has nowhere to go. We seal doorways with plastic and run a fan to the outside when we can, and we ask you to change the furnace filter when we are done.

Deliveries and the cut station. Flooring and trim get cut outside or in the garage, and a garage at ten degrees is a slow place to run a miter saw. We bring a heater for the cut station on the coldest days, and we ask for a cleared spot in the driveway so a delivery can land without a shovel.

Paint and caulk. Both cure more slowly when it is cold, and some products will not cure properly below their rated temperature. If you are painting behind us, keep the room warm and give the caulk an extra day.

Permits still apply

A finished basement, a bathroom that moves plumbing, or a new bedroom all need a permit, winter or not. In city limits, that is the Richfield building department; outside, it is Sevier County. Inspections run on the same schedule year round. We will tell you which parts of your job need a permit when we bid it, and we build to pass the first time.

Scheduling a winter job

The practical advice is simple. If you want a basement or a bathroom finished by spring, get on the calendar in November, because December fills up fast with people who had the same idea. Order anything with a lead time, like doors, vanities and tile, as soon as the bid is signed, and have it on site before demo starts. Plan for the house to be warm the whole time, including the nights.

Winter is when we are home, with a full crew, and not racing a storm. That makes it a good time to be our customer.

Have an inside job in mind?

A basement that is still studs, a bathroom you have been living with, floors that have seen enough. Send us a note with what you want done and we will come look at it, usually within the week.

Have a project in mind?Tell us what you're building and we'll come take a look.
Get a quote
← All posts