<item><title>Basement finishing basics for a Sevier Valley house</title><link>https://allen.build/blog/basement-finishing-basics</link><guid isPermaLink="true">https://allen.build/blog/basement-finishing-basics</guid><pubDate>Sun, 15 Nov 2026 14:00:00 GMT</pubDate><description>Egress, moisture, framing against concrete, ceiling height and permits. What goes into finishing a basement in Richfield, in the order it happens.</description><content:encoded><![CDATA[<p>Most houses in Richfield and the rest of the Sevier Valley have a basement, and a lot of them are still bare concrete, a furnace and boxes. Finishing one is the cheapest square footage you will ever add, because the foundation, the roof and the mechanical are already paid for. It is also the job where we see the most shortcuts. Here is what goes into a basement finish, in the order we do it.</p>
<h2>Start with water, not walls</h2>
<p>Before anyone talks about bedrooms, we want to know what the basement does in April. Walk the exterior walls and look for efflorescence, the white chalky stain concrete leaves when water has moved through it. Taping a square of plastic to the slab for a couple of days will tell you if moisture is coming up from below.</p>
<p>A damp basement can still be finished, but the water gets handled first. Around here that usually means grading and downspout extensions outside, not a sump pump inside. The problems we find are almost always roof water or a sprinkler aimed at the foundation.</p>
<h2>Egress comes before everything</h2>
<p>If the plan includes a bedroom, it needs an egress window, one big enough to climb out of, with a well outside it. Richfield and Sevier County both inspect for this, and a bedroom without one is not a bedroom on paper, no matter how nice it looks.</p>
<p>Cutting one means excavating, sawing the foundation, setting the window and the well, and patching the ground. Do that part before the ground freezes. If it is November and the window is not in yet, it is usually still workable, but it gets harder every week until March.</p>
<h2>Lay out around what cannot move</h2>
<p>The furnace, the water heater, the main drain and the electrical panel stay where they are. A good plan draws those in first and leaves real access. The furnace needs room for a filter change and a service tech. The panel needs clear space in front of it and cannot end up inside a closet or a bathroom. The cleanout has to stay reachable.</p>
<p>Ceiling height is the other fixed thing. Older Richfield basements can be short, and ducts, beams and drain lines drop lower still. We measure every low spot before drawing walls so the hallway does not run under the one duct that puts the ceiling at six and a half feet. Sometimes a soffit is the honest answer. Sometimes we move a duct a few feet.</p>
<h2>Framing against concrete</h2>
<p>This is the part people get wrong most. A basement wall is not framed like a wall upstairs.</p>
<p>The bottom plate sits on concrete, so it is treated lumber over a foam sill gasket, pinned or screwed to the slab. We hold the wall about an inch off the foundation so air can move behind it and the wall stays plumb even when the concrete is not, and foundation walls in this valley are rarely as straight as they look.</p>
<p>Insulation goes against the concrete first: rigid foam board, seams sealed, so warm room air never touches cold concrete and condenses. A fiberglass batt stuffed against a bare foundation wall is the most common thing we tear out of a basement that smells musty. Foam, then the framed wall, then batts in the stud bays if you want more, then drywall. No plastic vapor barrier on the warm side, which traps moisture here instead of letting the wall dry.</p>
<h2>Rough-ins, inspection, then cover</h2>
<p>Once the walls stand, the plumber and electrician run their rough-ins. A basement bathroom usually means breaking the slab for the drain, which is one loud day, and it is the moment to add a floor drain or a future rough-in while the concrete is open. Bedroom circuits need arc fault protection, outlets need to be tamper resistant, and smoke and carbon monoxide detectors go in now, wired and tied to the rest of the house.</p>
<p>Then the framing and rough-in inspection. Nothing gets covered until it is signed off. If a crew wants to hang drywall before that visit, slow down.</p>
<h2>Finish work</h2>
<p>Drywall, then doors, trim and floors. For a basement floor we steer most people toward luxury vinyl plank or tile, because both handle a little moisture and neither cares about a cold slab. Carpet is fine in a bedroom over a good pad. Hardwood on a basement slab is a gamble we do not recommend.</p>
<p>Interior doors, baseboard and casing are where a basement stops looking like a basement. Matching the door style and trim profile to the upstairs is a small cost that makes the whole house feel like one house.</p>
<h2>What to have ready before you call</h2>
<p>Know roughly what rooms you want and whether a bathroom is in the plan, because that drives the plumbing and the slab work. Take a few photos of the walls and floor after a wet week. If a bedroom is the goal, measure the window that is there now, because that tells us whether an egress cut is on the list.</p>
<h2>Ready to finish the downstairs?</h2>
<p>We frame, trim, hang doors and lay floors in basements across Sevier County all winter. <a href="/#contact">Send us a note</a> with what you are picturing and a couple of photos, and we will come walk it with you.</p>
]]></content:encoded></item>
<item><title>Winter is for interior work in Central Utah</title><link>https://allen.build/blog/winter-interior-work-in-central-utah</link><guid isPermaLink="true">https://allen.build/blog/winter-interior-work-in-central-utah</guid><pubDate>Sun, 01 Nov 2026 14:00:00 GMT</pubDate><description>Framing slows down when the Sevier Valley freezes. Basements, bathrooms, floors and trim do not. How we plan winter jobs and what to know first.</description><content:encoded><![CDATA[<p>Every year around the first week of November, the phone changes. The calls about foundations and trusses taper off, and the calls about basements, bathrooms, floors and doors pick up. That is not an accident. Winter in the Sevier Valley is hard on exterior work and easy on interior work, and if you plan it right, the cold months are the best time to get the inside of your house done.</p>
<p>Here is how we think about winter jobs in Richfield and the rest of Central Utah, and a few things worth knowing before you schedule one.</p>
<h2>Why framing slows down and trim does not</h2>
<p>At 5,300 feet, a January morning in Richfield can start in the single digits. Lumber stiffens, nail guns and compressors fight the cold, and a crew standing a wall in a stiff wind at twenty degrees is slower and less careful than the same crew in May. Snow on a subfloor has to be shoveled before anything happens. Foundations poured in the cold need to be protected while they cure. None of that stops a build, but it slows one, and it is why we push to have a house dried in before Thanksgiving.</p>
<p>Inside a heated house, none of that applies. A basement, a bathroom, a floor or a set of interior doors goes in at the same pace in January as in June, and often faster, because the whole crew is on it instead of split with a framing job racing the weather.</p>
<h2>What we like to do in winter</h2>
<p>Basement finishes are the big one. Most of the jobs we take between November and March are basements, because the work is entirely indoors, the homeowner gets a finished space by spring, and the framing, drywall backing, doors, trim and flooring are all things one crew can carry straight through. The one piece to plan ahead is an egress window. If your basement bedroom needs one cut in, the excavation and the concrete cutting go much easier before the ground freezes hard, so we try to get the window in during the fall and do the rest of the basement over the winter.</p>
<p>Bathroom remodels are the second. A tub to shower swap, new tile, a new vanity and a new door are all interior, and the work happens behind a closed door while the rest of the house stays warm.</p>
<p>Flooring, interior doors, baseboard and casing round it out. They make an older Richfield house feel new without touching an exterior wall.</p>
<h2>The things winter changes</h2>
<p>Winter does not make interior work harder, but it changes a few things worth knowing up front.</p>
<p><strong>Wood moves.</strong> Our winter air is dry. Hardwood, engineered wood and even LVP need to sit in the house, at normal living temperature, before they go down. We ask for the house to be heated to the temperature you actually live at for several days before and after a floor install. If a floor goes into a cold house and the heat comes on later, it will shrink and show gaps. The same goes for trim. Baseboard installed in a house at fifty degrees will open up at the miters when you turn the furnace to seventy.</p>
<p><strong>Dust and air.</strong> With the windows shut, dust from demolition and sanding has nowhere to go. We seal doorways with plastic and run a fan to the outside when we can, and we ask you to change the furnace filter when we are done.</p>
<p><strong>Deliveries and the cut station.</strong> Flooring and trim get cut outside or in the garage, and a garage at ten degrees is a slow place to run a miter saw. We bring a heater for the cut station on the coldest days, and we ask for a cleared spot in the driveway so a delivery can land without a shovel.</p>
<p><strong>Paint and caulk.</strong> Both cure more slowly when it is cold, and some products will not cure properly below their rated temperature. If you are painting behind us, keep the room warm and give the caulk an extra day.</p>
<h2>Permits still apply</h2>
<p>A finished basement, a bathroom that moves plumbing, or a new bedroom all need a permit, winter or not. In city limits, that is the Richfield building department; outside, it is Sevier County. Inspections run on the same schedule year round. We will tell you which parts of your job need a permit when we bid it, and we build to pass the first time.</p>
<h2>Scheduling a winter job</h2>
<p>The practical advice is simple. If you want a basement or a bathroom finished by spring, get on the calendar in November, because December fills up fast with people who had the same idea. Order anything with a lead time, like doors, vanities and tile, as soon as the bid is signed, and have it on site before demo starts. Plan for the house to be warm the whole time, including the nights.</p>
<p>Winter is when we are home, with a full crew, and not racing a storm. That makes it a good time to be our customer.</p>
<h2>Have an inside job in mind?</h2>
<p>A basement that is still studs, a bathroom you have been living with, floors that have seen enough. <a href="/#contact">Send us a note</a> with what you want done and we will come look at it, usually within the week.</p>
]]></content:encoded></item>
<item><title>What to expect during framing, week by week</title><link>https://allen.build/blog/what-to-expect-during-framing-week-by-week</link><guid isPermaLink="true">https://allen.build/blog/what-to-expect-during-framing-week-by-week</guid><pubDate>Thu, 15 Oct 2026 14:00:00 GMT</pubDate><description>Framing is the fastest and loudest part of a build. Here is what happens each week on a typical Sevier County house.</description><content:encoded><![CDATA[<p>Framing is the part of a build that people remember. The foundation sits there for weeks looking like nothing, and then one Monday a lumber truck shows up and by Friday you can walk through your kitchen. It also raises the most questions, because it moves fast. Here is how a typical single-family house in the Sevier Valley goes, week by week, so you know what you are looking at.</p>
<p>This assumes an ordinary one or two story house with a truss roof. A walkout basement, a stick-framed roof, or a January start will stretch it, and we will tell you where your house lands when we bid it.</p>
<h2>Before the crew shows up</h2>
<p>We do not start until a few things are true. The foundation has cured and the anchor bolts are where the plans say they are. The lot is graded so the lumber truck and a boom truck can get in without sinking. Power is on site, either a temporary pole or a generator. The lumber package has been delivered from the yard and stacked where it will not be in the way of the forklift.</p>
<p>If you are building, this is the week to make sure your designer has sent the final plan set and the engineering. We frame to the sheets we have, and we have seen more than one job stall because a revised sheet was sitting in someone&#39;s inbox.</p>
<h2>Week one: floor and first-floor walls</h2>
<p>On a crawl space or basement house, the first day or two go to the floor system. We set the sill plate on foam sealer, roll out the joists, hang the rim, and glue and nail the subfloor. When you come by Tuesday evening you will have a flat deck to stand on and not much else.</p>
<p>The rest of the week is walls. We snap lines on the deck, build each wall flat, then stand it up, brace it, and plumb it. Exterior walls go up first, then interior bearing walls, then the rest of the partitions. By Friday the first floor is a maze you can walk through, and this is the point where most homeowners say the rooms look small. They always look small without drywall and with no ceiling. Wait a week.</p>
<h2>Week two: second floor or ceiling, then trusses</h2>
<p>On a two story house, week two repeats week one on top of the first floor: joists, subfloor, walls. On a single story, we go straight to the ceiling and roof.</p>
<p>Truss day is the one to come watch. The trusses arrive on a flatbed, a crane or boom truck sets them one at a time, and the crew spaces, plumbs and braces each one as it lands. A plain gable roof can be set in a day. Hips, valleys, and vaulted great rooms take longer. Wind matters here. If a Sevier Valley afternoon is gusting hard enough to swing a truss, we wait, because a truss that comes down takes the braced ones with it.</p>
<h2>Week three: sheathing and drying in</h2>
<p>With the roof framed, the goal is to get the house dried in. Roof sheathing goes on first, then fascia and sub-fascia, then the exterior wall sheathing if it was not done when the walls were flat. House wrap and the window and door openings follow. We cut and flash the openings ourselves, and if we are installing your windows, they usually go in this week or the next.</p>
<p>Once the roof deck and wrap are on, rain and snow stop being an emergency. This is the milestone that lets the roofer, the siding crew and the mechanical trades get scheduled, so if you are managing your own build, now is when to lock in those dates.</p>
<h2>Week four: backing, blocking and the inspection</h2>
<p>The last week is the quiet one. The crew works through the inside of the house adding the things nobody sees: backing for cabinets, towel bars, handrails and TV mounts; fire blocking; blocking for drywall at corners and ceilings; the hold-downs, straps and hangers from the engineered sheets. Stairs usually get built now.</p>
<p>Then we call the Richfield building department, or Sevier County if you are outside city limits, for the framing inspection. The inspector checks the structure against the stamped plans, the hardware against the engineering, and the nailing on the shear walls. If something needs fixing, we fix it and call for a reinspection. Passing framing is what releases the plumber, electrician and HVAC crew to start rough-in.</p>
<h2>What you can do to keep it moving</h2>
<p>A few things make a real difference. Have the plans and engineering final before we start. Make your window and door selections early, because lead times are longer than people expect. Keep the driveway and the area around the house clear so deliveries can land. And if you want to change something, say it the week before, not the day the wall goes up. A moved doorway costs almost nothing on paper and a few hundred dollars once it is framed.</p>
<h2>Ready to frame?</h2>
<p>If you have a foundation going in this fall or plans on the table for spring, <a href="/#contact">send them our way</a> and we will tell you how many weeks your house will take and what has to be ready before we show up.</p>
]]></content:encoded></item>
<item><title>What a framing bid should include (and what it usually leaves out)</title><link>https://allen.build/blog/what-a-framing-bid-should-include</link><guid isPermaLink="true">https://allen.build/blog/what-a-framing-bid-should-include</guid><pubDate>Thu, 08 Oct 2026 14:00:00 GMT</pubDate><description>Two framing bids can be thousands apart and still be for different jobs. Here is how to read one so you are comparing the same thing.</description><content:encoded><![CDATA[<p>If you have ever held two framing bids side by side and wondered why one is $9,000 higher, the answer is usually not that one framer is greedy. It is that they bid two different jobs. One included the sheathing, the other assumed you would buy it. One priced the garage, the other stopped at the house. Until you know what is inside each number, you cannot compare them.</p>
<p>Here is what we put in ours, and what you should look for in anyone&#39;s.</p>
<h2>The plans it is based on</h2>
<p>A bid should name the plan set and the revision date. Plans change. If your designer sends out a new sheet with a taller plate height or a bigger header over the great room, and the bid was written against the old one, that difference shows up later as a change order. We write the plan date on every bid for this reason.</p>
<h2>Scope, line by line</h2>
<p>At minimum, a framing bid should say whether it includes:</p>
<ul>
<li><strong>Floor systems.</strong> Joists, rim, subfloor, glue and fasteners. On a crawl space or basement house this is a real chunk of the labor.</li>
<li><strong>Exterior and interior walls.</strong> Studs, plates, headers, blocking, and the backing for cabinets, towel bars and TV mounts. Backing is the thing that gets skipped and then costs you a drywall patch.</li>
<li><strong>Sheathing and house wrap.</strong> Some framers sheathe, some do not. Some wrap, some leave it to the siding crew. Ask.</li>
<li><strong>Roof.</strong> Trusses set and braced, or stick framed? Fascia and sub-fascia? Roof sheathing? Each of those is a separate yes or no.</li>
<li><strong>Stairs, decks and porches.</strong> Often bid separately. Make sure they are somewhere.</li>
<li><strong>Windows and exterior doors.</strong> We install them, because we frame the openings and would rather own the fit. Not every framer does.</li>
</ul>
<h2>Materials: who buys them</h2>
<p>A labor-only bid looks cheaper than a labor-and-materials bid by exactly the cost of the lumber. That is not a savings. Ask whether the number includes material, and if it does, ask whether the lumber package was priced from a takeoff of your plans or from a square-foot guess. A real takeoff from the lumberyard is what you want.</p>
<h2>Engineering and hardware</h2>
<p>Hold-downs, straps, hangers and the Simpson hardware called out on the engineered sheets add up. A bid that does not mention hardware either has it buried in the number or has not read the engineering yet. Either way, ask.</p>
<h2>Timeline</h2>
<p>How many weeks from the day the foundation is ready, and what has to be true for the crew to start? Concrete cured, lumber delivered, power on site, lot graded so a boom truck can get in. A good framer will tell you the start conditions up front, because a crew that shows up to a site that is not ready costs everyone a day.</p>
<h2>What it should not include</h2>
<p>Watch for round numbers with no breakdown, bids with no plan date, and &quot;to be determined&quot; on anything structural. And be wary of a number that is far below the others. In our experience that framer either missed something or plans to find it later.</p>
<h2>How we do it</h2>
<p>Our bids are itemized by the sections above, priced from a lumberyard takeoff of your actual plans, with the plan revision date written on the first page. If something is excluded, it is listed as excluded so you are not guessing. If you would like a bid like that, <a href="/#contact">send us your plans</a> and we will get back to you within a couple of business days.</p>
]]></content:encoded></item>
<item><title>Replacing windows before a Central Utah winter</title><link>https://allen.build/blog/replacing-windows-before-a-central-utah-winter</link><guid isPermaLink="true">https://allen.build/blog/replacing-windows-before-a-central-utah-winter</guid><pubDate>Tue, 06 Oct 2026 14:00:00 GMT</pubDate><description>Sevier Valley winters find every leaky window. What to look for, what to order, and why the install matters more than the brand.</description><content:encoded><![CDATA[<p>Richfield sits at 5,300 feet, and January here does not forgive a drafty window. If you have a room that never warms up, condensation on the inside of the glass on cold mornings, or a sash that has to be shouldered shut, the window is probably done. Here is how we think about replacing it.</p>
<h2>How to tell a window is finished</h2>
<ul>
<li><strong>Fog between the panes.</strong> The seal on the insulated glass unit has failed. The window still keeps out rain, but the insulating gas is gone, and so is most of the R-value.</li>
<li><strong>Frost or water on the inside.</strong> Some condensation on a single-pane window is normal in winter. On a double-pane, it means the glass is running far colder than it should.</li>
<li><strong>Soft wood or peeling vinyl.</strong> Once a wood frame rots at the sill, it will keep rotting.</li>
<li><strong>You can feel it.</strong> Hold the back of your hand near the frame on a windy day. If you feel moving air, that is money leaving the house.</li>
</ul>
<h2>Pick the glass for our climate</h2>
<p>Most of the Sevier Valley is in climate zone 5, which means cold winters and a fair amount of sun. For a replacement window here we recommend:</p>
<ul>
<li><strong>Double-pane, argon filled, with a Low-E coating.</strong> This is the baseline. Triple-pane is worth it on a north-facing wall or a bedroom over a garage, and not usually worth it elsewhere.</li>
<li><strong>A U-factor of 0.30 or lower.</strong> Lower is better. This is the number that matters most in winter.</li>
<li><strong>Solar heat gain coefficient depends on the wall.</strong> South and west windows benefit from a lower SHGC so August is bearable. North windows can take a higher one.</li>
</ul>
<p>Look for the NFRC label. Every real window has one, and it tells you these numbers without needing to trust a salesman.</p>
<h2>Full frame or insert?</h2>
<p>An <strong>insert</strong> (sometimes called a pocket replacement) slides a new window into the old frame. It is faster and cheaper, keeps your trim and siding untouched, and loses an inch or so of glass. It is a good choice when the existing frame is sound.</p>
<p>A <strong>full-frame replacement</strong> pulls everything out to the rough opening. It costs more and disturbs the exterior, but it is the only honest fix if the frame or sill is rotted, and it is the only way to properly flash the opening. We will tell you which one you need after we look, and we will not sell you a full frame if an insert will do.</p>
<h2>The install is where windows fail</h2>
<p>A top-shelf window installed badly leaks. A mid-range window installed well lasts thirty years. The things that matter:</p>
<ol>
<li>The rough opening is square, and the new unit is shimmed plumb and level, not just screwed to whatever was there.</li>
<li>The sill is sloped or pan-flashed so any water that gets in runs out.</li>
<li>Flashing tape is layered like shingles: bottom first, sides next, top last, so water runs over each seam rather than behind it.</li>
<li>The gap is filled with low-expansion foam, not the high-expansion kind that bows the frame.</li>
<li>The exterior gets sealed and trimmed so there is no bare gap waiting for a storm.</li>
</ol>
<p>We frame houses, so window openings are something we deal with every week. That is the main reason we install windows: we would rather be the people who make the opening and the people who fill it.</p>
<h2>Timing</h2>
<p>Window lead times run four to eight weeks for standard sizes and longer for custom. If you want new windows before the cold sets in, October is already late to order, and we would rather tell you that now than after you have waited. We can usually get an inspection scheduled within the week, so <a href="/#contact">reach out</a> and we will come take a look.</p>
]]></content:encoded></item>
<item><title>How to check a Utah contractor's license in two minutes</title><link>https://allen.build/blog/how-to-check-a-utah-contractor-license</link><guid isPermaLink="true">https://allen.build/blog/how-to-check-a-utah-contractor-license</guid><pubDate>Sat, 03 Oct 2026 14:00:00 GMT</pubDate><description>Before you hand anyone a deposit, look them up. Here is exactly where to check, what the classifications mean, and the questions that follow.</description><content:encoded><![CDATA[<p>Every year people in Sevier County pay a deposit to someone with a truck and a business card and never see them again. Most of the time a two-minute search would have raised the flag. Here is the search.</p>
<h2>Where to look</h2>
<p>Go to the Utah Division of Professional Licensing lookup at <strong>dopl.utah.gov</strong> and search by the company name or the owner&#39;s name. You will get a license number, a status, an expiration date, and a list of classifications. Any contractor who does work over $3,000 in Utah needs to be on that list. If they are not, stop there.</p>
<h2>What the status tells you</h2>
<ul>
<li><strong>Active</strong> is what you want.</li>
<li><strong>Expired</strong> means they may still be a decent builder, but they are not legally allowed to pull permits or contract with you until they renew.</li>
<li><strong>Probation or suspended</strong> is a conversation you should have before you do anything else.</li>
</ul>
<h2>What the classifications mean</h2>
<p>Utah licenses contractors by what they are allowed to build. A few you will see:</p>
<ul>
<li><strong>B100 General Building Contractor.</strong> Can build and remodel structures and hire subs for the whole job.</li>
<li><strong>E100 General Engineering Contractor.</strong> Roads, utilities, site work, structures that are not buildings.</li>
<li><strong>R100 Residential and Small Commercial.</strong> A general contractor limited to houses and small commercial buildings.</li>
<li><strong>S-series specialty licenses.</strong> Framing, roofing, electrical, plumbing, HVAC and so on. A specialty contractor can only do the work in their classification.</li>
</ul>
<p>A framer with an S-series framing license is fine to frame your house. If that same person offers to run the whole build, including the plumber and electrician, they need a B100 or R100 to do that legally. Ask which license the work will be done under.</p>
<h2>Insurance is separate</h2>
<p>A license does not mean insured. Ask for a certificate of insurance showing general liability and, if they have employees, workers&#39; compensation. Call the agent on the certificate to confirm it is current. A real contractor will not blink at this.</p>
<h2>Questions that follow</h2>
<p>Once the license checks out, the useful questions are the plain ones:</p>
<ol>
<li>Who is actually going to be on my job every day, and how many other jobs are they running?</li>
<li>Can I see something you finished last year, and talk to the owner?</li>
<li>What is not in this bid?</li>
<li>How do you handle changes, and what does a change order look like?</li>
<li>What is the payment schedule, and what is each payment tied to?</li>
</ol>
<h2>About us</h2>
<p>Allen Contracting, LLC is licensed with the Utah DOPL under license <strong>12857327-5501</strong>, with B100 General Building and E100 General Engineering classifications, and we carry general liability and workers&#39; compensation. You can look us up on the DOPL site right now, and we would encourage you to look up anyone else you are considering too. When you are ready to talk, <a href="/#contact">here is how to reach us</a>.</p>
]]></content:encoded></item>